Circular

Design-led manufacturing under Telecom PLI

Circular  |  Date: 24-06-2022  |  ELCINA  | 

24th June 2022

To: All ELCINA Members
Design-led manufacturing under Telecom PLI

Dear Member,

The Department of Telecom has launched an incentive scheme for Design-led manufacturers and extended the duration of the Rs 12,195 crore production-linked incentive (PLI) scheme by a year. The incentive for design-led manufacturing is part of the PLI scheme which was notified on February 24, 2021. The application window is open from June 21 till July 20. The incentives will be given from the Rs 4,000 crore which is left from the total outlay.

The amended PLI will also include the following items under various categories:

Srl Category Additions to the existing list in the category
1 “Core Transmission Equipment” Millimeter Radio, EN-band Radios; Satellite Gateway (Hub /Earth station) Equipment Free Space Optics Communication Equipment
2 "4G/5G, Next Generation Radio Access Network and wireless equipment" Telecom Antenna, Open-RAN Equipment (Radio Unit, Distributed Unit, Centralised Unit and RAN Intelligent Controller)
3 "Access & Customer Premises Equipment (CPE), IoT Access Devices and Other wireless Equipment" Internet Set Top Box, Satellite CPEs for accessing Internet, VSAT Equipment, NG-PON-ONT, Telecom modules of IOT/M2M Access Devices

Members may refer to the amended “Design Linked Incentive scheme under Telecom PLI” from the link provided here: https://dot.gov.in/sites/default/files/Design%20led%20manufacturing%20under%20Telecom%20PLI.pdf?download=1

Members are requested to kindly share their inputs regarding the subject scheme at ashish@elcina.com